Expected completion time of this lab:
. |
What is the join duty cycle? |
You can set its join duty cycle (between 0 and 255) by entering the following command:
> mset joindc <duty_cycle> |
You can read the join duty cycle by entering the following command:
> mget joindc |
Fill in the table below. For each measurement:
change the join duty cycle on the mote
switch the mote off
power-cycle the manager
switch the mote on and start a stopwatch
stop the stopwatch when both LEDs are on
|
Plot the average join time as a function of the join duty cycle:
|